Elizabethton Linear Path
Greenway · Elizabethton
The path runs beside the Watauga River down to Sycamore Shoals, and the river rises when TVA generates at Wilbur Dam. Today's schedule is on the Watauga River page.
At a glance
Checked November 23, 2026
- Length
- 6 miles, paved, from Eastside Elementary School to Sycamore Shoals
- Trailhead
- Either end: Eastside Elementary School or Sycamore Shoals State Historic Park
From nps.gov. Distances and ratings are the source's; conditions change, so check the official page.
Official status
Open Official status, verified November 14, 2026
The city's Linear Trail page posts no closure.
City of Elizabethton is the official source. Status as that page stated it on November 14, 2026; it can change.
Ranger and agency notices
No agency notices on file. Check City of Elizabethton.
Visitor reports
Visitor reports are what someone saw on the trail. They are not official.
About Elizabethton Linear Path

What it is
The Linear Path is a paved walking and biking trail of approximately six miles through Elizabethton. On maps it is labeled the Linear Park Trail, but locally it is known as the Linear Path. It starts at Eastside Elementary School, follows the Doe River through downtown, and then runs down the Watauga River to Sycamore Shoals State Historic Area. Benches, picnic tables and bike racks are spaced along it, and the city points out several fishing spots on the way.
The route has a Revolutionary War connection. The National Park Service includes it in the Overmountain Victory National Historic Trail story, because on September 25, 1780, William Campbell and his Virginia Patriots followed the Doe River along this path to the planned meeting at Sycamore Shoals.
Where to get on
The two ends are Eastside Elementary School and Sycamore Shoals State Historic Area. In between, the path links several city parks. One of them is Covered Bridge Park at 700 Third Street, which sits on both banks of the Doe River at the Elizabethton Covered Bridge, built in 1882. Edwards Island, a small park just north of Covered Bridge Park, is another stop along the way.
Before you go
The path runs right beside the Doe and Watauga Rivers, so stay back from the banks when the water is high and stay off flooded sections. Expect walkers, cyclists and people fishing. The city lists a Linear Path and Tweetsie Trail connector among its projects, so access points may change. Check the City of Elizabethton page for parking, access and current notices before you go.